abalorios.es

Añade Abalorios.es a tus favoritos

   

Haz Abalorios.es tu pagina de inicio

abalorios en español cristal beads in English  pt  de  it  fr
    Home.
    Links.
Programa Esquemas y Patrones con Abalorios www.abalorios.es
Programa Esquemas y Patrones
Libro Manualidades con Abalorios www.abalorios.es
Libro Manualidades con Abalorios
Creative Commons License

Motigo Webstats - Web site estadísticas gratuito El contador para sitios web particulares
rss
nosotros

abalorios movil

Política de
privacidad

Llámanos y te ayudamos a encontrar los materiales 626 30 50 12 (de Lunes a Viernes de 10h a 17h)

Glass beads: Pending tutorial DAL2

Slope DAL2

We are going to make slopes with ball done of tupis and pebbles.

   Pendiente DAL2   

MATERIALS

-12 Tupis 4mm Swarovski crystal

- Pebbles

- Pin of slope and slope hook

- Thread nylon 0.3mm

   MATERIALES   

STEP 1

We lined up 4 pebbles

   PASO 1   

STEP 2

We crossed the thread in the fourth pebbles

   PASO 2   

STEP 3

In one of 2 threads (p.e drcho) we lined up tupi (1), pebbles, tupi (2), pebbles and tupi (3)

   PASO 3   

STEP 4

We crossed threads by tupi3 and the thread that leaves by down we passed it through the adjacent pebbles

   PASO 4   

STEP 5

By the thread of above we lined up pebbles, tupi (4), pebbles and tupi (5)

   PASO 5   

STEP 6

We crossed the thread by tupi 5 and the thread that goes downwards we passed it through the following pebbles

   PASO 6   

STEP 7

In the thread of above we lined up pebbles, tupi (6), pebbles and tupi (7)

   PASO 7   

STEP 8

We crossed threads by tupi 7 and the thread that leaves downwards we passed it through the last pebbles of the first step and through tupi 1

   PASO 8   

STEP 9

We crossed threads by new tupi (8)

   PASO 9   

STEP 10

In one of threads (for example the left one) we lined up tupi (9), pebbles, tupi (10)

   PASO 10   

STEP 11

We crossed threads by tupi 10 and in the thread that leaves downwards we lined up a pebbles and we passed it through tupi 6

   PASO 11   

STEP 12

In the thread that leave upwards in tupi 10 we lined up pebbles and tupi (11) and in the other thread we lined up a pebbles

   PASO 12   

STEP 13

We crossed threads by tupi11, in the thread that leaves downwards we lined up a pebbles and we passed it through tupi4

   PASO 13   

STEP 14

In the thread that leaves tupi11 upwards we lined up a pebbles and I complete tupi (12), in the other thread we lined up a pebbles

   PASO 14   

STEP 15

We crossed threads by last tupi, lined up in each thread a pebbles and passed each thread through tupi adjacent

   PASO 15   

STEP 16

we closed the ball with knot and glue

   PASO 16   

STEP 17

We have the ball that we finished doing, the slope pin in which we have made a curtain ring in one of the ends and slope hook

   PASO 17   

STEP 18

We insert the pin by one of the circles of 4 pebbles and we removed it by the one from opposite

   PASO 18   

STEP 19

With the aid of pliers of round end we make a curtain ring

   PASO 19   

STEP 20

We obtain a ball with 2 curtains ring

   PASO 20   

STEP 21

In one of the curtains ring we hooked the hook of the slope

   PASO 21   
Tiendas de abalorios Sigela.com