Dal1 slope
With these slopes we are going to combine the use of pins and the lined up one with nylon
|
|
|
Materials
- Pebbles - 14 Tupi of 4mm of crystal of Swarovski - Thread nylon 0,3mm - Pin of slope and slope hook - Tools: pliers of round end
|
|
|
STEP 1
We lined up 8 pebbles in the thread
|
|
|
STEP 2
We crossed the thread by 2 last pebbles
|
|
|
STEP 3
In one of threads (p.e drcho.) we lined up 1 tupi (1) and 2 pebbles
|
|
|
STEP 4
We crossed 2 threads by a second tupi (2) and the thread that leaves by the part down we passed it through 2 adjacent pebbles
|
|
|
STEP 5
In the thread that leaves by the part above tupi we lined up 2 pebbles and tupi (3)
|
|
|
STEP 6
We crossed threads by tupi3 and the thread of down we passed it through 2 adjacent pebbles
|
|
|
STEP 7
In the thread that leaves by above tupi3 we lined up 2 pebbles and tupi (4)
|
|
|
STEP 8
We crossed 2 threads by tupi4 and passed threads through the 2 pebbles that lack as well as by tupi which we put in step 3
|
|
|
STEP 9
We crossed threads by 2 new pebbles
|
|
|
STEP 10
We are going to repeat the previous steps to make a "second floor" to the piece, so in the thread of right we lined up tupi (5), 2 pebbles and tupi (6)
|
|
|
STEP 11
We crossed threads by tupi 6 and the thread that leaves by down we passed it through the 2 pebbles that there are down to left beaten
|
|
|
STEP 12
In the thread that leaves by above in tupi 6 we lined up 2 pebbles and tupi (7)
|
|
|
STEP 13
We crossed threads by tupi 7 and the thread that leaves by down we passed it through 2 adjacent pebbles of down
|
|
|
STEP 14
In the thread that leaves by above tupi 7 we lined up 2 pebbles and tupi (8)
|
|
|
STEP 15
We crossed threads by tupi 8 and the thread that leaves underneath we passed it through adjacent pebbles and tupi that there is opposite (tupi 5) and crossed threads by 2 new pebbles
|
|
|
STEP 16
Again we repeated this sequence to make a third floor (according to the length of the pin that we have we put floors more or less). In the thread of drcha. we lined up tupi (9), 2 pebbles and tupi (10)
|
|
|
STEP 17
We crossed threads by tupi 10 and the thread that leaves downwards we passed it through 2 perpendicular pebbles
|
|
|
STEP 18
In the thread that leaves upwards in tupi 10 we lined up 2 pebbles and tupi (11)
|
|
|
STEP 19
We crossed threads by tupi 11 and the thread that leaves downwards we passed it through 2 adjacent pebbles
|
|
|
STEP 20
In the thread that leaves upwards in tupi 11 we lined up 2 pebbles and tupi (12)
|
|
|
STEP 21
We crossed threads by tupi 12 and the thread that leaves downwards we passed it through 2 pebbles of "down", tupi of opposite (tupi 9), we lined up 2 new pebbles and we make the knot with the other thread, applied glue and we cut the leftovers
|
|
|
STEP 22
We have the "cylinder" of tupis and pebbles that we finished doing, the pin and the hook
|
|
|
STEP 23
We put tupi (13) by the pin of the slope
|
|
|
STEP 24
We put the cylinder and another one tupi (14) by the pin of the slope
|
|
|
STEP 25
With the aid of it tiles of round end we make a curtain ring with the leftover of the pin (leftover must measure 7mm)
|
|
|
STEP 26
We hooked the hook in the curtain ring that we finished doing
|
|
|